SETTINGS • TESTING • COMMISSIONING

Protection Testing & Commissioning

Specialized support for relay settings, panel testing, and commissioning of protection systems on ABB, Schneider Electric, SEL, and Siemens platforms, plus commissioning experience involving GE IEDs.

ABB, GE, Schneider Electric, SEL, and Siemens
Experience at substations up to 500 kV
Brazil, USA, and Poland
Fluent English

The Challenge

Testing and commissioning windows are short, and settings, logic, or interface issues often show up only in the field, when fixing them costs more.

How KR Helps

Technical support for your team, by scope or period, connecting approved settings, logic, integration, and field verification.

  • Implementation of client-approved settings.
  • Test procedures and acceptance criteria agreed before execution.
  • Logic selectivity testing and interlock verification.
  • Open items recorded with owners at the end of each stage.
WHAT CAN BE HIRED

Activities & Deliverables

Hire the stage you need: preparation, testing, field work, or documentation

IED Settings

Implementation of approved settings and logic in ABB, Schneider Electric, SEL, and Siemens IEDs.

Typical deliverables:

  • Configuration files based on approved settings
  • Contracted logic implemented and documented
  • Firmware and software version checks
  • Record of changes made

Panel Testing & FAT

Functional testing of protection panels before shipment, according to agreed procedures and acceptance criteria.

Typical deliverables:

  • Functional tests of contracted protections
  • Logic selectivity tests
  • Interlocking and signaling checks
  • Test report and open-items list

Field Commissioning

Field verification of protection, integration, and logic, supporting the client's commissioning team.

Typical deliverables:

  • Functional field tests
  • SCADA integration checks
  • Support during site acceptance testing (SAT)
  • Record of results and open items

Documentation & Handover

Delivery of agreed final files, records, and open items, with verifiable criteria defined in the proposal.

Typical deliverables:

  • Final configuration files
  • Test reports in the agreed format
  • As-built updates when contracted
  • Open-items list with owners

Platforms and Tools

The brands listed describe professional experience; they do not represent partnerships or manufacturer certification

ABB Relion 615 / 650 / 670GE IEDs (commissioning)Schneider Easergy, MiCOM P & C264 BCUSEL-751 / 787 / 2414Siemens SIPROTEC 5 & DIGSI 5IEC 61850 (GOOSE / MMS)OMICRON Test Universe
TEST EQUIPMENT

Test Equipment

Supplied by the client or planned as a rental, with calibration evidence defined in the proposal

OMICRON CMC relay test setSecondary Injection

OMICRON CMC Relay Test Set

A reference for protection relay testing with Test Universe software, used in previous field work.

Test UniverseSecondary InjectionRelay Testing
Vebko AMT 205 relay test setSecondary Injection

Other Relay Test Sets

Other relay test sets can be used depending on availability from the client or rental.

Subject to AvailabilityRental
Digital insulation testerComplementary Tests

Complementary Instruments

Insulation testers, micro-ohmmeters, and other instruments are defined in the scope, with agreed supplier and requirements.

Defined in ScopeCalibration Evidence
FAQ

Frequently Asked Questions on Testing & Commissioning

Scope, test equipment, and mobilization

Who supplies the test set and accessories?

Test equipment is supplied by the client or planned as a rental. Supplier, accessories, and calibration evidence are defined in the proposal, before booking the schedule.

Does KR develop the settings or only implement them?

It depends on the scope. For implementation-only scopes, KR uses the approved settings provided by the client. When studies are also hired, the proposal defines who prepares, reviews, and approves the settings.

Do you work outside Brazil?

Yes. There is experience on projects in the United States and Poland, with fluent English. International mobilization requirements are defined case by case in the proposal.

Is a test or commissioning coming up?

Describe the type of installation, the equipment involved, and the planned window so we can define the next step.

Request a technical call