AUTOMATION & INDUSTRIAL TELECONTROL

Power System Automation & Communication Protocols

Complete Substation Automation System (SAS) and power plant architectures compliant with IEC 61850, featuring deep expertise in industrial communication protocols (DNP3, IEC 60870-5-104), modern SCADA HMIs, and zero-loss PRP/HSR networks.

IEC 61850 Edition 1 & 2 Standards
Utility Protocols DNP3 / IEC 60870-5-104
Zero-Loss PRP / HSR Redundancy
Multi-Vendor BCU & Gateway Integration

The Complexity of Digital Substations

Modern digital substations require seamless integration of multi-vendor IEDs across station and process buses, requiring determinism, zero packet loss, and full compliance with regional utility and grid operator telemetry mandates.

Our End-to-End Integration Capability

We design, engineer, configure, and commission complete SAS architectures covering process, bay, and station levels. We deliver ultra-fast GOOSE messaging, reliable MMS reporting, telecontrol gateways, and high-availability SCADA HMIs with millisecond SOE timestamping.

  • Proven multi-vendor interoperability across SEL, Siemens, Schneider, GE, and ABB platforms.
  • Zero recovery time on network communication links using PRP and HSR protocols.
  • Flawless telemetry commissioning and sign-off with national grid control centers.
  • Ergonomic, situational-awareness SCADA HMIs with real-time diagnostic reporting.
TECHNICAL DELIVERABLES

Technical Capabilities in Automation & Networks

Cutting-edge engineering for mission-critical transmission and industrial assets

SAS Architecture & IEC 61850 Standards

Design and engineering of substation automation systems according to IEC 61850 Ed. 1 and Ed. 2. Implementation of Station and Process Buses, SCD/SSD/CID file integration.

Key Engineering Deliverables:

  • Physical and logical network architecture engineering drawings
  • Substation Configuration Description (.SCD) file compilation
  • Fast horizontal GOOSE messaging for interlocking and trip (< 4 ms)
  • MMS reporting and client-server parameterization for SCADA

Communication Protocols & Grid Telecontrol

Implementation of standard communication protocols for dependable interconnection between the substation and utility dispatch centers via dedicated telemetry links.

Key Engineering Deliverables:

  • DNP3.0 gateway parameterization (Serial RS-232/485 & TCP/IP)
  • IEC 60870-5-104 and IEC 60870-5-101 channel integration
  • Comprehensive telemetry point lists approved and point-to-point verified
  • Secure remote command handling with Select-Before-Operate (SBO)

High-Availability Industrial Networks (PRP/HSR)

Dimensioning and configuration of managed industrial Ethernet switches in deterministic topologies to eliminate network single points of failure.

Key Engineering Deliverables:

  • Dual independent LAN implementation using PRP (Parallel Redundancy)
  • Closed-ring topologies configured with HSR (Seamless Redundancy)
  • Nanosecond-grade clock synchronization via IEEE 1588v2 PTP and IRIG-B
  • VLAN isolation, QoS prioritization, and cybersecurity hardening

Substation SCADA & Operational HMIs

Development of modern local and remote supervisory control systems ensuring complete situational awareness and intuitive plant operation.

Key Engineering Deliverables:

  • Dynamic single-line diagrams with bay control interlocks
  • Intelligent prioritized alarm management and COMTRADE oscillography
  • Auditable Sequence of Events (SOE) recording with millisecond precision
  • Automatic restoration logic and emergency load shedding schemes

Supported Protocols & Industrial Technologies

Global standards and platforms from industry-leading manufacturers

IEC 61850 Ed. 1 & 2GOOSE / MMS / Sampled Values (SV)DNP3.0 (Serial & TCP/IP)IEC 60870-5-104 / 101Modbus RTU / TCPPRP & HSR RedundancyPTP (IEEE 1588v2) & SNTPBCU C264 / MiCOMSiemens SICAM & SIPROTECSEL Real-Time Automation Controllers (RTAC)
PLATFORMS & INSTRUMENTATION

IEC 61850 Engineering, SCADA & HMI Platforms

Specialized engineering software tools for multi-vendor IED integration and real-time situational control

IEC 61850 Engineering Software (SEL Architect)SAS Configuration & Digital Bus

IEC 61850 Engineering Software (SEL Architect)

Full lifecycle engineering of Substation Configuration Description (.SCD / .CID) files in SEL Architect, logical node mapping, high-speed GOOSE control blocks, and MMS reporting.

SEL Architect.SCD / .CID EngineeringGOOSE Messaging (< 4ms)MMS Datasets
SCADA System (SAGE / CEPEL) & Real-Time TelemetryControl Center Supervisory

SCADA System (SAGE / CEPEL) & Real-Time Telemetry

Control center and substation SCADA engineering using the SAGE (Cepel / Eletrobras) open energy management platform, real-time MW/MVAR monitoring, utility grid telecontrol, and millisecond SOE.

SAGE (Cepel / Eletrobras)Single-Line MimicsDNP3 / IEC 60870-5-104Grid Code Telecontrol
Operational HMI, Bay & Switchboard Control (PMS)Local Human-Machine Interface & Switchboard

Operational HMI, Bay & Switchboard Control (PMS)

Touchscreen panels and local HMIs for 690V / Medium-Voltage switchboard control, generator monitoring, busbar management, BESS, breaker status, and real-time safety interlocking.

Industrial Touchscreen690V / MV SwitchboardGenerators & BESSSafety Interlocks
FAQ

Frequently Asked Questions on Power System Automation

Practical insights into IEC 61850 implementation and telecontrol protocols

What is the distinction between GOOSE and MMS messages in IEC 61850?

GOOSE messages operate directly at the Ethernet data link layer (Layer 2) for ultra-fast peer-to-peer relay trip and interlock exchanges (< 4 ms). In contrast, MMS messages use the TCP/IP stack (Layer 7) for client-server communication between IEDs and SCADA supervisory stations.

How do you guarantee zero communication downtime in SAS networks?

We deploy PRP (Parallel Redundancy Protocol), where every Ethernet packet is duplicated and sent simultaneously over two completely separate LANs, or HSR (High-availability Seamless Redundancy) in rings, delivering zero-millisecond failover if a cable or switch fails.

Can you handle complete point-to-point testing with the grid operator?

Yes. We manage the entire lifecycle: telemetry point mapping, gateway protocol configuration, and live point-by-point end-to-end testing with utility and transmission operators.

Ready to Digitize or Automate Your Substation?

Consult our industrial network and IEC 61850 automation engineers to architect your system.

REQUEST AUTOMATION PROPOSAL