Survey & Shutdown Preparation
Review of the existing configuration, interfaces, and intervention window to define the scope and required input data.
Typical deliverables:
- List of required data and documents
- Map of the interfaces involved
- Activity plan for the planned window
- Risks and assumptions recorded in the proposal