Explore our track record in commissioning high and extra-high-voltage substations (230 kV to 500 kV), offshore wind farm integration, and multi-vendor SAS engineering.
Engineering, integration, and commissioning of a 230 kV substation, integrating MiCOM P-series IEDs (transformer, feeder, and line) with the MiCOM C264 Bay Control Unit.
Commissioning of a 400 kV extra-high-voltage substation integrating offshore wind farm power into the Polish national transmission grid, featuring GE, ABB IEDs, and BCU C264.
Offshore Wind Service Operation Vessel (SOV) Commissioning (USA)
Electrical commissioning and automation of a state-of-the-art Service Operation Vessel (SOV) dedicated to offshore wind turbine maintenance in the United States.
Application:Offshore Wind Farm Field Operations (USA)
Commissioning of a 500 kV extra-high-voltage substation in Espírito Santo, integrating, parameterizing, and secondary testing new Siemens SIPROTEC 5 digital IEDs.
Operating Voltage:500 kV (Extra High Voltage)
IED Family:Siemens SIPROTEC 5 (7SA/7SL/7UT/7SJ)
Engineering Software:Siemens DIGSI 5 & OMICRON Test Universe